Beach Point Club

Clubhouse Clubhouse renovation and addition including a full-service bar, casual dining and exterior dining terrace with pergola. Locker Room A new locker room building was constructed and connected to the existing cabanas with a new boardwalk. A new beach bar and dining pavilion complete the picturesque setting overlooking Long Island sound and Mamaroneck harbor. The…

The St. Andrews Golf Club

Indoor Practice Facility The recently completed 4,000sf state of the art indoor practice and teaching facility at St. Andrew’s draws from the architecture of the historic campus and is the finishing touch to their renovated golf practice facilities. A casual lounge equipped with tv’s, fireplace, buffet and bar create a social destination for members on…

New Canaan Country School

Stevens Building The building combines 25,000 sf of new construction and 18,000 sf of renovated space. It includes new and renovated classrooms as well as a new common room, science labs, and art studios. It has achieved LEED Silver Certification. Thatcher Building The building houses the school’s Pre-K program which is based on the early…

Far Hills Country Day School

Gymnasium Along with new locker rooms and fitness area, the new gymnasium has transformed the school’s physical education and athletic programs. The building has achieved LEED Gold Certification. Performing Arts Center The new Performing Arts Center transformed a gymnasium into a 650 seat performance space with state-of-the art theatrical lighting, rigging, sound and video systems…

The Milbrook Club

The new snack bar and outdoor dining area addresses the club’s need for expanded casual outdoor dining. The covered section of the patio includes a bar, an area for buffets, and covered dining that overlooks the golf course. The Tudor style snack bar also compliments the style of the main clubhouse.

Chelsea Piers CT

SPORTS COMPLEX Converted from a 1966 warehouse, this commercial recreational facility has about 400,000sf of program space under one roof. Facilities include an Olympic swimming pool, water park, two ice hockey rinks, gymnastics facility, 12 squash courts, 7 tennis courts, two basketball courts and a soccer field. [Tour] ATHLETIC FACILITY After enormous success with the…

Private Country Club

Beach Pavilion This pavilion replaces an older building that stood at the site since the club’s founding in the 1920’s. It consists of two separate structures joined by a walkway deck. One structure includes dining and a full service commercial kitchen; the other includes showers, toilets, locker, changing areas, and staff offices.

Whitby School

Founders Hall This project included the complete renovation of the school’s original 1950’s classroom building. The project includes changes to the corridor system with the addition of a central rotunda, new larger classrooms, library and mechanical system. Caedmon Hall This project involved transforming an aging 1960’s classroom building into a combined performing arts & administrative…

New Canaan YMCA

Program areas included general purpose program spaces a 4,000 sf fitness/wellness center, new multi purpose aerobics room, new child care and pre-school facilities as well as a new lobby and administrative areas. The project included 20,000 sf of new building and 20,000 sf of renovations and alterations.

Yale University

Leigh Hall Renovation The Collegiate Gothic building was designed in the mid-1920’s as the University infirmary. Later, as part of the School of Music, it served its purpose poorly. The complete renovation of the building’s interior and exterior introduced state-of-art instructional and performance space as well as faculty studio/offices.